PennDOT has put up an overview and plans for the Route 20 Bridge Replacement project.
The project will include removal of the existing three-pier bridge (then replaced) with a concreted structure with a single pier. The project will also include guiderail and drainage updates.
Demolition work and new pier construction is expected to occur in 2024. The top of the bridge and minor paving work near the bridge is expected to take place during the 2025 construction season.
The existing detour will remain during all phases of construction and is expected to be in place until early fall 2025.
Route 20 Bridge Replacement Project – PennDOT site
Erie Co Route 20 Bridge Replacement Project Handout
Erie Co Route 20 Bridge Replacement Structure Plans
Erie Co Route 20 Bridge Replacement Right-of-Way Plan